MSA Consulting, Inc. was retained to perform all of the civil engineering design and surveying services for the 1 million square foot Arrowhead Water Bottling Facility. The project in Cabazon is located on Indian land within the Reservation of the Morongo Band of Mission Indians. It was the first building in the Tribe’s planned Morongo Intermodal Transload and Industrial Center (MITIC), an ambitious master-planned industrial park. The Arrowhead Water Bottling Facility for Nestle Waters North America represents a further refinement and knowledge development of the LEED (Leadership in Energy and Environmental Design) program. The Cabazon plant received a LEED Silver certification.

Healthcare
DHS Health and Wellness Center
The Desert Hot Springs Health and Wellness Center including the Boys & Girls Club/Aquatic Center Facility, located on the east side